Decommissioning Technologies

INFORMATION: For more information, contact C. Grandy or visit the D&D website
Image Credits: Unless otherwise specified, credits go to D&D - Nuclear Engineering Division of Argonne.

 

Navigate this Category: Previous | Next

Characterization - Pipe Explorer System?  The system performed alpha surveys of the internal area of three 5-inch pipe-lined holes in the CP-5 rod storage area. These pipes are embedded in the structure of the building. This picture shows the piping insertion hookup.

Characterization - Pipe Explorer System?
The system performed alpha surveys of the internal area of three 5-inch pipe-lined holes in the CP-5 rod storage area. These pipes are embedded in the structure of the building. This picture shows the piping insertion hookup.