Decommissioning Projects: EBWR

INFORMATION: For more information, contact C. Grandy or visit the D&D website
Note on Image Credits: Unless otherwise specified, image credits go to D&D - Nuclear Engineering Division of Argonne.

 

The turbine generator was removed from the facility early in the decommissioning process.

The turbine generator was removed from the facility early in the decommissioning process.

The reciprocating saw was used to segment numerous piping systems for their removal from the facility.

The reciprocating saw was used to segment numerous piping systems for their removal from the

A split ring milling machine is set in place to perform the dismantling of the reactor cavity liner at EBWR.

A split ring milling machine is set in place to perform the dismantling of the reactor cavity liner

The decommissioning of the EBWR (Experimental Boiling Water Reactor) began in 1986 and was completed in February 1996.

The decommissioning of the EBWR (Experimental Boiling Water Reactor) began in 1986 and was